游客你好,登录后能编辑wiki哦!

全站通知:

资源采集

阅读

    

2022-01-26更新

    

最新编辑:Lu_23333

阅读:

  

更新日期:2022-01-26

  

最新编辑:Lu_23333

来自异星工厂WIKI_BWIKI_哔哩哔哩
跳到导航 跳到搜索
页面贡献者 :
逗比的马老师
我爱五子棋37
Lu_23333
Warning-icon.png
本页面正在施工中!您也可点击此处协助编辑,感谢各位对wiki的贡献。

Mining is used to extract resources from the world. Mining drills are the first step to automating manufacture, although most resources have to be smelted in a furnace for further usage.

Mining speed formula

The rate at which resources are produced is given by:

Mining speed / Mining time = Production rate (in resource/sec)

To calculate the time needed for one resource-item use this formula:

Mining time / Mining speed = Seconds for one resource item

Mining speed is a function of the miner while mining time is a function of the metal or mineral you are currently mining (you can place a miner over a mixed field).

Mining by hand

When mining by hand, the formula is modified slightly:

(1 + Mining Speed Modifier) * .5 / Mining time = Production rate (in resource/sec)

Infinite resources

The output of the unmodified resource is the percentage yield of the tile currently used by the miner.

  Output of unmodified field * ( Number of modules in miner * Bonus from module ) + Output of unmodified field * ( Number of beacons * ( Number of modules * Distribution efficiency ) * Bonus from module + Productivity research bonus + 1 ) = Raw output per second 
   (Raw output per second * Mining speed) / Mining time = Production rate (in resource/sec)

The mining drill or pumpjack will sum the production rate of all tiles below it and show that value in the tooltip.

Drill types

Item Total raw Mining speed Mining power Covered area Max health
空手采集空手采集 - 0.5 - 1 × 1 250
Burner-mining-drill.png热能采矿机 Iron-plate.png9 Stone.png5 0.25 150 kW (burner) 2 × 2 150
Electric-mining-drill.png电力采矿机 Iron-plate.png23 Copper-plate.png4.5 0.5 90 kW (electric) 5 × 5 300

Note, that the Burner mining drill covers exactly its size (2×2, the covered area is also 2×2), while the Electric mining drill is one tile bigger (size is 3×3, but covered area is 5×5).

Mining drills can only be placed on resources.

Output

Resource Burner M. Drill Electric M. Drill
Speed: 0.25 Speed: 0.5
Iron Time: 1 Iron-ore.png0.25/s Iron-ore.png0.5/s
Copper Time: 1 Copper-ore.png0.25/s Copper-ore.png0.5/s
Coal Time: 1 Coal.png0.25/s Coal.png0.5/s
Stone Time: 1 Stone.png0.25/s Stone.png0.5/s
Uranium Time: 2 Uranium-ore.png0.25/s

Unlike most other equipment, mining drills will output resources directly without the need of inserters. This includes transport belts, chests, other mining drills, furnaces, assembling machines etc.

The above figures are modified by Mining productivity technology, which adds to any bonus from productivity modules.

Burner mining drill entity.png Burner drill to furnace.png